Main Dam Water Release Alert

by | Oct 9, 2026 | Uncategorized

⚠PUBLIC NOTICE ⚠

Deer Lake Power advises residents of Deer Lake and nearby communities that beginning on Wednesday, October 14th, at approximately noon, spill gates at Main Dam will be opened for a controlled release of water from the reservoir.

The release is required to maintain a safe water elevation in the Grand Lake Reservoir.

The duration of the release is currently unknown.

What to Expect:

• Water will be released over Main Dam, through Junction Brook and into the Upper Humber River.

• Water levels will rise during the spilling period and may continue to fluctuate in the following days.

• Areas that are currently accessible by land may become submerged or cut off.

Safety Reminder:

Please use caution near shorelines and waterways. Be aware of potential hazards, including:

• Slippery or unstable banks

• Strong currents

• Floating debris

Please remain vigilant and monitor for changing conditions.

Continue to monitor local updates for further information