
PUBLIC NOTICE
Deer Lake Power advises residents of Deer Lake and nearby communities that beginning on Wednesday, October 14th, at approximately noon, spill gates at Main Dam will be opened for a controlled release of water from the reservoir.
The release is required to maintain a safe water elevation in the Grand Lake Reservoir.
The duration of the release is currently unknown.
What to Expect:
• Water will be released over Main Dam, through Junction Brook and into the Upper Humber River.
• Water levels will rise during the spilling period and may continue to fluctuate in the following days.
• Areas that are currently accessible by land may become submerged or cut off.
Safety Reminder:
Please use caution near shorelines and waterways. Be aware of potential hazards, including:
• Slippery or unstable banks
• Strong currents
• Floating debris
Please remain vigilant and monitor for changing conditions.
Continue to monitor local updates for further information
